All templates
Free template

A fence estimate template that counts posts, not just footage.

Linear feet is where a fence quote starts. Corners, gates, slope, and what is in the ground are where the money goes.

Get the fence estimate template

A working spreadsheet, not a picture of one. The totals, overhead, and margin are live formulas. We email it over, so no download to lose track of.

One email with the template attached. We will not pass your address on.

Fencing is the trade where a flat per-linear-foot rate is most tempting and most dangerous. It quotes easily on the phone and it is quietly wrong on any yard that is not flat, clear, and rectangular. Which is most yards.

The template

SectionLine itemUnitWhat decides it
LayoutTotal runLinear feetMeasured along the line
LayoutLine postsCountSpacing, usually 6-8 ft
LayoutCorner and end postsCountHeavier, deeper, slower to set
LayoutGate postsCountReinforced pairs
LayoutPost depthInchesFrost line and local code
MaterialPanels or picketsPanels or countStyle and species
MaterialRailsLinear feetRail count per section
MaterialPostsCountMaterial and dimension
MaterialConcreteBagsPer post, by depth and diameter
MaterialHardware and fastenersLotStyle
GatesSingle gateEachWidth and hardware, quoted per gate
GatesDouble or drive gateEachDrop rod, reinforced posts
GroundSlope treatmentLinear feetStepped or racked
GroundRock or hard diggingPer postContingency, stated as such
GroundRoot and obstruction workHoursTrees along the line
GroundUtility locateLotLegally required, has lead time
RemovalOld fence removalLinear feetPosts in concrete cost more
RemovalDisposalLoadVolume and footing weight
TotalsJob cost, overhead, profitSum, percent, percentThree separate lines

Posts, not ribbon

Post count drives digging labor, concrete, and a large share of material. A yard with five corners costs more than a straight run of the same footage, because corner, end, and gate posts carry more load, often go deeper, and take longer to set square. A per-foot rate hides all of that.

Slope is the adjustment most quotes miss

On sloped ground you are choosing between stepping the fence, which keeps each panel level and leaves gaps at the bottom, and racking it to follow the grade, which needs racking-capable panels or stick-built construction with every picket cut individually. The second is a great deal more labor.

A photo of the grade tells you more than any description a customer gives on the phone, where "a little uneven" covers everything from a gentle fall to a bank you will be cutting steps into. More in how to estimate a fencing job.

Two lines that protect you

Rock is genuinely unknowable before you dig. Rather than absorbing it, put a stated per-post contingency on the sheet so the conversation happens before the auger stops at post seven of thirty.

Property lines are a legal risk, not a construction one, and moving a fence built a foot over costs whoever built it. Where the boundary is uncertain, write that a survey is the customer's responsibility and that the quote assumes the line as marked. That sentence costs nothing and has saved a lot of fencing contractors.

Quoting from a walked and photographed line beats quoting from a total scribbled on a business card, particularly on the yards that were hardest to build.

Ready to quote faster?

Create an account and turn your next call into a proposal today.

Get started