A drywall estimate template that separates hang from finish.

Board count, finish level, and the corner and opening counts that predict hours better than square footage does.

Get the drywall estimate template

A working spreadsheet, not a picture of one. The totals, overhead, and margin are live formulas. We email it over, so no download to lose track of.

One email with the template attached. We will not pass your address on.

Drywall looks like the easiest trade to template. Flat surfaces, standard sheets, simple multiplication. Then you price a basement full of soffits and a stairwell at the same rate as a rectangular room and discover where the hours went.

The sheet below splits hang from finish, because they use different crews at different rates, and puts the real cost drivers on their own lines.

The template

SectionLine itemUnitWhat decides it
QuantitiesWall and ceiling areaSquare feetMeasured, not floor area
QuantitiesBoard countSheetsArea divided by sheet coverage, plus 10-15%
QuantitiesSheet length8 / 10 / 12 ftLonger means fewer butt joints
QuantitiesBoard typeSheetsStandard, moisture, fire-rated, sound
HangWall hangSquare feetArea
HangCeiling hangSquare feetSlower than walls
HangHeight surchargeSquare feetAbove 8 ft, stilts or staging
FinishFinish level3 / 4 / 5Level 5 skims every square foot
FinishTape and coat, flat seamsLinear feetSeam length
FinishInside cornersLinear feetCorner count, the real driver
FinishOutside corners and beadLinear feetBead footage
FinishOpenings and returnsCountDoors, windows, archways
FinishTextureSquare feetType, and whether it must match existing
SiteDust protection and cleanupRoom or jobOccupied or vacant
SiteStocking and accessHoursStairs, tight turns, upper floors
TotalsJob cost, overhead, profitSum, percent, percentThree separate lines

Finish level is the line customers have never heard of

The industry defines finish levels 0 through 5, and the labor gap between them is large even though material cost barely moves. Level 4 is the normal residential finish. Level 5 adds a skim coat across the entire surface, which is what you need under gloss paint or raking natural light.

Put it on the sheet in plain language. If a customer with big windows and satin paint expects a glass-smooth wall and you priced Level 4, that disagreement surfaces after the painter has finished and it is expensive to settle.

Count corners, not just square feet

The best predictor of finishing hours is how many corners a space has. Every inside corner is taped and every outside corner takes bead, and both are slower per foot than a flat seam. That is why the sheet has separate lines for inside corners, outside corners, and openings rather than one finishing rate.

More on the reasoning in how to estimate a drywall job.

Patch and repair work

Repairs are priced by the visit, not the area. A small patch needs the same setup, dust protection, and three coats with drying time between them as a large one, which makes most patches a multi-visit job. Pricing one visit is the standard way to lose money on small work.

Texture matching deserves its own line and an honest conversation. A patch that is structurally perfect but visibly different is a callback, and if the texture cannot be blended, the real scope is refinishing to a break. Saying that upfront is much easier than saying it afterward.