A construction proposal template that separates the promise from the price.

Scope, exclusions, schedule, payment terms, and a bid schedule by division, laid out so the customer signs the document and not just the number.

Get the construction proposal template

A working spreadsheet, not a picture of one. The totals, overhead, and margin are live formulas. We email it over, so no download to lose track of.

One email with the template attached. We will not pass your address on.

A construction proposal is two documents pretending to be one. The first is a promise: what you will build, what you will not, when, and on what terms. The second is a price, broken down far enough that the customer trusts it and not so far that they argue every line. Most construction proposal templates are good at one half and treat the other as an afterthought.

The layout below keeps them apart on purpose. The written sections are the contract the customer is actually agreeing to. The bid schedule is the arithmetic behind the total, and the spreadsheet version carries the overhead and margin lines so the number is right before it reaches the page.

The proposal, section by section

SectionWhat goes in itWhy it is its own section
HeaderYour company, license number, customer, project address, proposal number, date, valid-until dateA proposal with no expiry is a price you are stuck with in six months
Scope of workWhat you will build, by area or division, in plain sentencesThis is the part that gets read aloud in a dispute
ExclusionsWhat the price does not include: permits, engineering, utility fees, landscaping repair, hazardous materialEvery exclusion you write is a change order you will not have to fight for
AllowancesOwner-selected items with a per-unit or lump allowance: fixtures, tile, countertopsLets the customer choose later without re-bidding
Bid scheduleLine items by division with quantity, unit, unit price, and totalThe spreadsheet half; see below
ScheduleStart window, duration, and what delays the clock (selections, weather, inspections)A date with no conditions is a date you will miss
Payment termsDeposit, progress draws tied to milestones, final payment, late termsCash flow is decided here, not on the invoice
Change ordersHow changes are priced and approved, in writing, before workThe clause that protects the margin on every job that changes
WarrantyWorkmanship period and what it covers; manufacturer warranties passed throughSet the expectation before the first callback
AcceptanceSignature, printed name, date, for both partiesUnsigned proposals are suggestions

The bid schedule

The spreadsheet is organized by division, roughly in the order the work happens, with a quantity and unit price on every line and a subtotal, overhead recovery, and profit margin at the bottom. The divisions are a starting list, not a rule; delete the ones your project does not touch rather than leaving them blank, because an explicit zero is information and a blank is a question.

DivisionTypical linesUnit
General conditionsPermits and fees, supervision, dumpster, portable toilet, temporary protection, cleanupLump, days, each
DemolitionSelective demo, haul-off, disposalHours, loads
Site and concreteExcavation, footings, slab, flatworkCubic yards, square feet
FramingWalls, headers, blocking, sheathingSquare feet, linear feet
ExteriorRoofing, siding, windows, doorsSquares, square feet, each
Mechanical, electrical, plumbingRough-in and trim by trade; equipmentEach, fixtures, circuits
Insulation and drywallInsulation by cavity, board hang and finishSquare feet
FinishesFlooring, tile, paint, trim, cabinets, countertopsSquare feet, linear feet, each
AllowancesOwner selections carried at a stated amountLump
TotalsJob cost subtotal, overhead recovery, profit (as a margin), price to customerSum, percent, percent

Sample proposal language

Scope: "Contractor will remove the existing kitchen cabinetry, countertops, and flooring; relocate the sink supply and drain approximately four feet west; install owner-selected cabinetry and quartz countertops per the attached layout; and install luxury vinyl plank flooring throughout the kitchen and adjoining hallway. Electrical work is limited to two new 20A small-appliance circuits and under-cabinet lighting."

Exclusions: "This proposal does not include permit fees, structural engineering, repair of concealed conditions discovered after demolition, appliances, or painting of adjoining rooms. Concealed conditions will be priced as a written change order before work proceeds."

Payment: "Thirty percent on acceptance. Forty percent on completion of rough-in inspection. Balance on substantial completion, prior to final walkthrough punch list. Invoices are due within seven days."

Filling it in

Write the scope before the price, not after. A scope written to justify a number already decided tends to be vague in exactly the places that cost money later. Price the schedule from a real cost book, with labor at a burdened rate and profit entered as a margin rather than a markup; the markup vs margin calculator shows why those are different numbers.

Then read the exclusions as the customer will: every item that is not in the scope and not in the exclusions is a conversation you will have on site with the clock running. The full reasoning on documents is in estimate, quote, bid, proposal: what the difference actually is.

When a template stops being enough

A proposal template formats the promise. It does not remember what the customer said about the pantry wall, and it does not stop two estimators on your team pricing the same kitchen two different ways. FlyQuote builds the proposal from a lead record that already holds the photos, the call, and the answers, prices every line from your own cost codes, and sends it as a branded page the customer signs. The proposal guide shows what that looks like.

Ready to quote faster?