What Your Bid Win Rate Should Be, and What It's Telling You
FlyQuote Team · July 25, 2026

Most contractors have a rough sense of how often they win. Few have the number, and the number tends to be surprising in one direction or the other.
Win rate is quotes sent divided into quotes accepted, over a period long enough to mean something. A quarter minimum, a year if your jobs are large. It's the simplest diagnostic in a contracting business and one of the least used.
The range
Roughly one in five is a widely cited average across residential contracting. A strong rate is usually put somewhere in the twenty-five to forty percent band, varying a lot by trade, by market, and by how you get leads.
Those figures are worth holding loosely, because context changes them completely. A contractor bidding public work through open tender against eight competitors is playing a different game than one working exclusively from referrals. The referral business might win seventy percent and the tender business fifteen, and both could be healthy.
What matters more than the benchmark is your own number, tracked over time, and what moves it.
Too low, and the causes are not all price
A rate well under twenty percent usually gets diagnosed as "we're too expensive," and sometimes that's right. Often it isn't, and jumping to a price cut fixes a problem you didn't have while creating one you did.
Speed is the most common real cause. If your quote arrives fourth, several days after the walkthrough, you're being compared against contractors the customer has already been talking to. Plenty of jobs are effectively decided before the last bid lands.
Presentation is the next. Three quotes within a few percent of each other get separated by which one demonstrated an understanding of the actual job. A number in an email loses to a document that references the customer's specific conditions, even at a slightly higher price.
Then there's who you're quoting. A low win rate can simply mean you're bidding work that was never a good fit: wrong size, wrong distance, wrong type, or a customer who was always going to choose on price alone. That's a lead qualification problem wearing a pricing problem's clothes.
Too high, which almost nobody worries about
If you're winning seventy or eighty percent of what you bid, and you're not running on referrals in a trust-based niche, you are very probably priced too low.
This feels wrong because the business looks successful. The schedule is full, the phone rings, the reviews are good. And every one of those jobs is earning less than it could have, which is a much harder problem to see than an empty calendar.
The test is uncomfortable and simple. Raise your prices on the next stretch of quotes and watch what happens to the win rate. If it drops from seventy-five percent to fifty-five, you're doing fewer jobs at meaningfully better margin, which is usually more profit and definitely less work. If it collapses, you've learned something real about your market for the cost of a few quotes.
A high win rate is not a trophy. It's a signal that you're leaving room on the table, and the room compounds across every job you take.
Track the losses, which is the actual work
The win rate on its own tells you something is off. Why it's off requires knowing what happened to the ones you lost, and that means asking.
A short message to a customer who went elsewhere, asking what decided it, gets answered more often than people assume. Not always honestly, since "you were expensive" is the polite universal answer, but patterns emerge across enough of them.
Worth separating in your own records:
- Lost on price to a named competitor
- Lost on timing, because you couldn't start when they needed
- Lost on responsiveness, where someone else got there first
- Went quiet and never decided, which is a follow-up problem rather than a bidding one
- Project cancelled or postponed entirely, which is not a loss at all and shouldn't be counted as one
That last category matters for the arithmetic. Counting cancelled projects as losses drags your rate down and points you at a pricing problem that doesn't exist.
The cost of the quote itself
Every estimate costs something to produce. Site visit, drive time, measurement, the hour or two writing it up. At a twenty percent win rate you're absorbing the cost of five quotes for every job you land.
Which gives you two levers, and most contractors only think about one. You can win a larger share, or you can make each quote cheaper to produce. Halving the time it takes to produce a quote improves the economics exactly as much as a meaningful jump in win rate, and it's usually easier to achieve.
It also compounds with the first lever, since faster quotes tend to arrive earlier, and arriving earlier is one of the more reliable ways to win more of them.
Measure it before you change anything
The reason this analysis rarely happens is that the data doesn't exist. Quotes live in an email folder, wins live in the accounting software, and nobody has ever counted them against each other.
Anything that records what went out and what came back, even a spreadsheet updated weekly, puts you ahead of most of the trade. Once the number exists you can move it deliberately, and until it exists every pricing decision is a guess dressed up as instinct.